InfraSource was contracted by PSE to tie in the North Tacoma Gate Station into the existing system with 20″ STW pipe.

Project Details
  • Project Length: 8 weeks

  • Installed approximately 3200 feet of 20 inch STW pipe
  • Retired approximately 2850 feet of 16 inch STW pipe
  • Drilled 2600 feet including crossing underneath the White River