InfraSource was contracted by PSE to tie in the North Tacoma Gate Station into the existing system with 20" STW pipe. Project Details Project Length: 8 weeks Installed approximately 3200 feet of 20 inch STW pipe Retired approximately 2850 feet of 16 inch STW pipe Drilled 2600 feet including crossing underneath the White River